Sunday, October 30, 2016
Week 10 (Oct 26 - Nov 2)
For this week as a team we are preparing for our presentation, making sure that we have everything covered. We also want to make sure that are calculations are correct by consulting different professors and going over what we did and plan to do.
Monday, October 24, 2016
Week 9 (Oct 19 - Oct 26)
For this week as a team we are working on our presentation. Making sure that we cover everything that is required, such as updating our current design, make sure the calculations are correct, etc.
Monday, October 17, 2016
Week 8 (10/12 - 10/19)
For the week of October 12 to October 19, we are in the process of figuring out how to combine each system. See pictures below for sketches of what we plan to do.
Figure 1: Sketch of tilt mechanism
Figure 1 is a rough sketch of the four bar mechanism we want to use based on previous CAD work.
Figure 2: How we plan to attach tilt mechanism to bogie
Figure 2 is a possible configuration to support the tilt mechanism and the self-leveling mechanism. The idea in this sketch was to support the tilt mechanism rigidly and then support the self-leveling mechanism at 4 points. The self-leveling mechanism is a square so we would make 4 tilt mechanisms that would connect at each corner.
Figure 3: How we plan to attach tilt mechanism to the self-leveling system
Figure 3 shows this idea with one tilt mechanism connected at one corner.
Tuesday, October 11, 2016
Week 7 (10/5 - 10/12)
As a team we are continuing to do the CAD drawings using Solid Works. We are also utilizing Grab Cad so that we can see how our design fits with all the other designs. Once we get that finished and the whole system looks like it can all work together then we can start to 3D print our system to get a prototype to test even more before the final design.